Building and garden calculators

The core math is a volume or an area. A waste margin (offcuts, redo, relief) is added because a site is not a perfect slab.

Concrete or gravel density depends on the mix. Paint coverage depends on the substrate. Enter real dimensions and read the product sheet for coverage and coats.

Most used

Subcategories

Volumes

Concrete, gravel and mulch: length × width × depth.

Areas

Paint and flooring, with coats or offcuts.

Full list

Questions

Should I always add 10% waste?

No. 10% is a reasonable default for many slabs and floors. Complex layout, an uneven substrate or a pattern needs more. A simple rectangle may need only 5%.